在新选项卡中打开链接
  1. Copilot 答案
    Queen Elizabeth-class aircraft carrier - Wikipedia

    Only one carrier will have a Carrier Air Wing embarked at any one time. In peacetime, 12 - 24 F-35Bs will be embarked. This will rise to 36 F-35Bs during combat operations, with the ability to operate 48 in extreme circumstances. The ships have a sortie generation rate of up to 110 per day. Fourteen Merlin HM2 will be available with typically nine in anti-submarine configuration and four or five with Crowsnest for airborne early warning; alternatively a "

    Only one carrier will have a Carrier Air Wing embarked at any one time. In peacetime, 12 - 24 F-35Bs will be embarked. This will rise to 36 F-35Bs during combat operations, with the ability to operate 48 in extreme circumstances. The ships have a sortie generation rate of up to 110 per day. Fourteen Merlin HM2 will be available with typically nine in anti-submarine configuration and four or five with Crowsnest for airborne early warning; alternatively a "littoral manoeuvre" package could include a mix of Royal Navy Commando Helicopter Force Merlin HC4, Wildcat AH1, RAF Chinook transports, and Army Air Corps Apache attack helicopters. As of September 2013 six landing spots are planned, but the deck could be marked out for the operation of ten medium helicopters at once, allowing the lift of a company of 250 troops. The hangars are designed for operating Chinooks without blade folding and the Bell Boeing V-22 Osprey tiltrotor; the two aircraft lifts can each accommodate a Chinook with unfolded blades.

    The use of UAVs and UCAVs is currently being explored by the Royal Navy. In November 2023, the General Atomics Mojave

    在 Wikipedia 上阅读更多信息

    Wikipedia

    The Queen Elizabeth-class aircraft carriers of the United Kingdom's Royal Navy consists of two vessels. The lead ship of her class, HMS Queen Elizabeth, was named on 4 July 2014 in honour of Elizabeth I and was commissioned on 7 December 2017. Her sister ship, HMS Prince of Wales, was launched on 21 December 2017, and was commissioned on 10 December 2019. They form the central components of the UK Carrier Strike Group.

    The contract for the vessels was announced in July 2007, ending several years of delay over cost issues and British naval shipbuilding restructuring. The contracts were signed one year later on 3 July 2008, with the Aircraft Carrier Alliance, a partnership formed with Babcock International, Thales Group, A&P Group, the UK Ministry of Defence and BAE Systems. In 2014 the UK Government announced that the second carrier would be brought into service, ending years of uncertainty surrounding its future. This was confirmed by the Strategic Defence and Security Review 2015, with at least one carrier being available at any time.

    The vessels have a full load displacement of an estimated 80,600 tonnes (79,300 long tons; 88,800 short tons), are 284 metres (932 ft) long and are the largest warships ever constructed for the Royal Navy. The Carrier Air Wing (CVW) will vary depending on the type and location of deployment, but will consist of 12-24 F-35Bs under in peacetime and 36 in a conflict scenario (with up to 48 in extreme cases) and Merlin helicopters to conduct Anti-Submarine Warfare, Airborne Early Warning and utility roles. The projected cost of the programme is £6.2 billion.

    The 2010 Strategic Defence and Security Review announced the intention to purchase the Lockheed Martin F-35C "carrier variant" and to build Prince of Wales in a Catapult Assisted Take-Off Barrier Arrested Recovery (CATOBAR) configuration. However, in 2012, after projected costs of the CATOBAR system rose to around twice the original estimate, the government announced that it would revert to the original design deploying F-35Bs from Short Take-Off and Vertical Landing (STOVL) configured carriers.

    继续阅读

    In May 1997, the newly elected Labour government led by Tony Blair launched the Strategic Defence Review, which re-evaluated every weapon system, then active or in procurement, with the exception of the Eurofighter Typhoon and the Vanguard-class ballistic missile submarines. The report, published in July 1998, stated that aircraft carriers offer:
    • The ability to operate offensive aircraft overseas, when foreign bases may not be available early in a conflict
    • All required space and infrastructure, as even where foreign bases are available infrastructure is often lacking
    • A coercive and deterrent effect when deployed to a trouble spot
    The report concluded: "the emphasis is now on increased offensive airpower, and an ability to operate the largest possible range of aircraft in the widest possible range of roles. When the current carrier force reaches the end of its planned life, we plan to replace it with two larger vessels. Work will now begin to refine our requirements but present thinking suggests that they might be of the order of 30,000–40,000 tonnes and capable of deploying up to 50 aircraft, including helicopters."
    Initial Ministry of Defence (MoD) design studies for what was then the Invincible class replacement were conducted in the mid-1990s. Options considered at this early stage included the possibilities of lengthening the hulls and extending the life of the existing Invincible class ships, converting commercial ships to carriers, and the construction of purpose-built new aircraft carriers.

    On 25 January 1999, six companies were invited to tender for the assessment phase of the project – Boeing, British Aerospace (BAe), Lockheed Martin, Marconi Electronic Systems, Raytheon and Thomson-CSF. On 23 November 1999, the MoD awarded detailed assessment studies to two consortia, one led by BAe (renamed BAE Systems on 30 November 1999) and one led by Thomson-CSF (renamed Thales Group in 2000). The brief required up to six designs from each consortium with air-groups of thirty to forty Future Joint Combat Aircraft (FJCA). The contracts were split into phases; the first £5.9 million phase was for design assessment which would form part of the aircraft selection, while the second £23.5 million phase involved "risk reduction on the preferred carrier design option".

    In 2005 BMT announced it had tested 4 different CVF hull form models and assessed them for propulsion efficiency, maneuverability, seakeeping and noise signatures. It also investigated skeg length, rudder size, transom stern flaps and bulbous bow designs. The basic Delta concept went through many further iterations and development before the design was considered sufficiently mature by late 2006 for detailed cost estimates to be drawn up prior to ordering long-lead items.
    The vessels, described as "supercarriers" by the media, legislators and sometimes by the Royal Navy, have a full load displacement of an estimated 80,600 tonnes (79,300 long tons; 88,800 short tons) each, over three times the displacement of its predecessor, the Invincible class. They are the largest warships ever built in the United Kingdom. The last large carriers proposed for the Royal Navy, the CVA-01 programme, were cancelled by the Labour government in the 1966 Defence White Paper. In November 2004 First Sea Lord Admiral …

    在 Wikipedia 上阅读更多信息

    继续阅读

    The ships' company is 679, rising to 1,600 when the air crew is added. In April 2015 a parliamentary reply stated that the average crew size would be 672. The ships have an empty load displacement of 65,000 tonnes on delivery, with an estimated full load displacement of 80,600 tonnes as the ships are upgraded through their lifetime. They have an overall length of 284 metres (932 ft), a width of 73 metres (240 ft), a height of 56 metres (184 ft), a draught of 11 metres (36 ft), and a range of 10,000 nautical miles (12,000 mi; 19,000 km). Nuclear propulsion was rejected due to its high cost and manpower required in favour of Integrated Electric Propulsion consisting of two Rolls-Royce Marine Trent MT30 36 MW (48,000 hp) gas turbine generator units and four Wärtsilä diesel generator sets (two 9 MW or 12,000 hp and two 11 MW or 15,000 hp). The Trents and diesels are the largest ever supplied to the Royal Navy, and together they feed the low-voltage electrical systems as well as four GE Power Conversion's 20 MW electric propulsion motors that drive the twin fixed-pitch propellers.

    Instead of a single island superstructure containing both the ships' navigation bridges and flying control (FLYCO) centres, the ships have these operations divided between two structures, with the forward island for navigation and the aft island for controlling flying operations. The primary reason for having twin islands was to space out the funnels, as the ships were designed with redundancy with "duplicated main and secondary machinery in two complexes with independent uptakes and downtakes in each of the two islands", while the alternative of consolidating all the exhaust trunkings would have reduced hangar space as well as increasing the vulnerability to flooding. Additional benefits include easier construction, reduced wind turbulence, and freed up deck space. Using two structures provides separate mountings for the air surveillance radar (forward), which does not interfere with the medium-range radar (aft); furthermore, visibility is improved for both navigation and landing operations.

    Under the flight deck are a further nine decks. The hangar deck measures 155 by 33.5 metres (509 by 110 ft) with a height of 6.7 to 10 metres (22 to 33 ft), large enough to accommodate up to twenty fixed and rotary wing aircraft. To transfer aircraft from the hangar to the flight deck, the ships have two large lifts, each of which is capable of lifting two F-35Bs or one CH-47 Chinook from the hangar to the flight deck in sixty seconds. The ships' only announced self-defence weapons are currently the Phalanx CIWS for airborne threats and Browning .50 caliber heavy machine guns. The planned 30 mm cannon to counter seaborne threats are currently fitted for but not with as of 2021 .
    The ship's radars are the BAE Systems/Thales S1850M for long-range wide-area search, the BAE Systems Artisan 3D Type 9…

    在 Wikipedia 上阅读更多信息

    继续阅读

    During a speech on 21 July 2004, Geoff Hoon announced a one-year delay to allow contractual and cost issues to be resolved. The building of the carriers was confirmed in December 2005. The building was undertaken by four companies across seven shipyards, with final block integration and assembly at Rosyth:
    BAE Systems Surface ShipsGovan (Lower Blocks 3 and 4), Scotstoun (aft island) and Portsmouth (Lower Blocks 2, 5 and forward island)
    Babcock MarineRosyth (Sponsons, Mast and Centre Blocks 5 and 6) and Appledore (Lower Block 1)
    A&P GroupHebburn (Centre Block 3)
    Cammell LairdBirkenhead (Centre Blocks 2 and 4)
    In December 2007, eight diesel engines and electricity generators, four for each ship, were ordered from Wärtsilä. On 4 March 2008, contracts for the supply of 80,000 tonnes of steel were awarded to Corus Group, with an estimated value of £65 million. Other contracts included £3 million for fibre optic cable, over £1 million for reverse osmosis equipment to provide over 500 tonnes of fresh water daily, and £4 million for aviation fuel systems. On 3 April 2008, a contract for the manufacture of aircraft lifts (worth £13m) was awarded to MacTaggart Scott of Loanhead, Scotland.

    In mid May 2008, the Treasury announced that it would be making available further funds on top of the regular defence budget, reportedly allowing the construction of the carriers to begin. This was followed, on 20 May 2008, by the government giving the "green light" for construction of the Queen Elizabeth class, stating that it was ready to sign the contracts for full production once the creation of the planned shipbuilding joint venture between BAE Systems and the VT Group had taken place. This joint venture, BVT Surface Fleet, became operational on 1 July 2008. VT Group later sold its share to BAE Systems which renamed the unit BAE Systems Surface Ships. It undertook approximately forty per cent of the project workload.

    On 1 September 2008, the MoD announced a £51 million package of important equipment contracts; £34 million for the highly mechanised weapons handling system for the two ships, £8 million for supply of uptake and down-take systems for both ships, £5 million for air traffic control software, £3 million for supply of pumps and associated systems engineering, and £1 million for emergency diesel generators. On 6 October 2008, it was announced that contracts had been placed for "the carriers' Rolls-Royce gas turbines, generators, motors, power distribution equipment, platform management systems, prope…

    在 Wikipedia 上阅读更多信息

    继续阅读
  1. 某些结果已被删除