![](/rp/kFAqShRrnkQMbH6NYLBYoJ3lq9s.png)
Upper North Fork Feather River Project - Wikipedia
The Upper North Fork Feather River Project is a hydroelectric scheme in the Sierra Nevada of California, within Lassen and Plumas Counties. The project consists of three dams, five power plants, and multiple conduits and tunnels in the headwaters of the North Fork Feather River, a major tributary of the Feather—Sacramento River systems.
California State Water Project - Wikipedia
The Feather River, a tributary of the Sacramento River, provides the primary watershed for the State Water Project. Runoff from the Feather River headwaters is captured in Antelope, Frenchman, and Davis reservoirs, which impound tributaries …
Feather River - Wikipedia
The Feather River and its forks were a center of gold mining during the 19th century. Since the 1960s, the river has provided water to central and southern California, as the main source of water for the California State Water Project. Its water is also used for hydroelectricity generation.
Upper North Fork Feather River Hydroelectric Project | California …
2020年7月15日 · The Upper North Fork Feather River Hydroelectric Project (UNFFR Project) is located on the North Fork Feather River in Plumas County. It consists of three reservoirs with dams: Lake Almanor, Butt Valley reservoir and Belden forebay; five powerhouses; tunnels and penstocks connecting the reservoirs to the powerhouses; and transmission, operation ...
SWP Facilities - Department Of Water Resources
The lake is part of the Upper Feather River Project within the Plumas National Forest, and was constructed to provide recreation opportunities, to maintain the natural beauty of the area, and to improve fish habitat in Indian Creek by assuring a constant, year-round flow …
The Upper North Fork Feather River Hydroelectric Project (Project), Federal Energy Regulatory Commission (FERC) Project No. 2105, is located along the North Fork Feather River in Plumas County, and includes Lake Almanor, Butt Valley Reservoir, and Belden Forebay. The Project is owned and operated by Pacific Gas and Electric
History - Department Of Water Resources
After additional surveys and investigations, the Division submitted a revised Feather River Project in 1955. The revised project added the San Luis Reservoir and proposed a South Bay Aqueduct serve San Benito County.
Oroville - Department Of Water Resources
2023年2月8日 · Constructed between 1966 and 1967, the Feather River Fish Hatchery was built to compensate for spawning ground lost to returning salmon and steelhead trout with the construction of Oroville Dam. The first salmon and steelhead …
New Project License: The new license issued by FERC for the Project at the conclusion of the current relicensing proceeding, including any mandatory conditions such as FPA Section 4(e) Conditions, 401 Certification conditions, and FPA Section 18 fishway prescriptions. NFFR: North Fork Feather River.
2017年6月23日 · The project is located on the Feather River in Butte County, California, and encompasses 41,540 acres (Figure 1). The project includes three power plants, two on-river impoundments, and two off-river impoundments. The proposal by PG&E to permanently reroute its transmission line will