
WSOG stands for Well Specific Operating Guidelines. The WSOG document is used to define actions to be taken by a DPO in the event of certain changes to the DP units capability.
As the WSOG require both approval (contractor + client), many technical discussion are needed to get into consensus. This paper intends to start a discussion with the international DP community to analyse the concepts adopted by IMCA for WSOG by comparing them with Petrobras’ point of view.
WSOG and Emergency Disconnection Guidelines - OnePetro
2017年10月24日 · The two most relevant tools for reducing the impact related to the DP System failure are the Well Specific Operating Guidelines (WSOG) and the Emergency Disconnection Guidelines.
WSOG Catholic Radio Home Page
WSOG, 88.1 FM, is the primary station in a listener-supported group broadcasting EWTN Catholic radio programs and local programs. St. St. Bede Academy hosts our studio in Spring Valley, Illinois.
3.22 well specific operating guidelines (wsog) 45 3.23 communications 48 3.24 communications guidance notes 49 3.25 dp planned maintenance 49 3.26 dp incidents 50 3.27 reporting and record keeping 52 3.28 competence 53 3.29 manning 55 4 abbreviations 57 5 intervention – role of the dpo and engineer 58 5.1 general 58
SPECIAL REPORT: Well-specific guidelines adopted for dynamic ...
2006年11月26日 · For each well or location, a dynamically positioned rig is given well-specific operational guidelines (WSOG), which determine when alerts should be given and what action is appropriate.
WSOG | Well Engineering Glossary by Wild Well Control
Wild Well Control is a global leader in well control response, innovative engineering, subsea intervention systems, and well control training.
1 GENERAL
1.2.1 Activity-Specific Operating Guidelines (ASOG) means guidelines on the operational, environmental and equipment performance limits for the location and specific activity. (For drilling operations, the ASOG may be known as the Well-Specific Operating Guidelines (WSOG)).
Risk Management Tools (CAMO-TAM-ASOG/WSOG) - Medea srl
2015年2月5日 · The risk management methods that have been increasingly used through the offshore industry are the CAMO, TAM and ASOG/WSOG. IMCA M220 establishes clear definitions on such tools, as follows: CAMO – Critical Activity Mode of Operation : sets out the most fault tolerant configuration for the DP system and associated plant and equipment.
Well-specific guidelines adopted for dynamic positioning
2006年11月27日 · The well-specific operational guidelines (WSOG) document is used to define actions to be taken by a dynamic-positioning operator (DPO) in the event of certain changes to the DP unit's...
- 某些结果已被删除