Chennai Metro Rail expands with Phase II, including Corridor 5 connecting Madhavaram to Shollinganallur with 47 km of track.
The total length of these new metro lines will be approximately 119 kilometres including 128 stations. The three corridors include Madhavaram to SIPCOT having a length of 45.8 km with 50 metro ...
来自MSN4 个月
Cabinet greenlights Chennai Metro Phase II: 128 stations and 118.9 km of new lines across 3 ...Once operational, Chennai will have a 173 km metro rail network. Here are the 3 corridors Corridor 1: Madhavaram to SIPCOT (45.8 km, 50 stations) Corridor 2: Lighthouse to Poonamallee Bypass (26.1 ...
CHENNAI: The nine-kilometre metro rail stretch under the second phase from Poonamallee to Porur, with 10 stations, will be ...
The 118.9-km project of Chennai Metro Rail’s Phase II is implemented at a cost of Rs. 63,246 crore; it comprises three corridors — Madhavaram to SIPCOT, Light House to Poonamallee, and Madhavaram to ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果